作业帮 > 英语 > 作业

英语翻译关于矿业方面的(51)Ministry of Energy Mines Division has carried

来源:学生作业帮 编辑:搜搜考试网作业帮 分类:英语作业 时间:2024/06/05 16:26:59
英语翻译
关于矿业方面的
(51)Ministry of Energy Mines Division has carried out extensive geological investigations in the Mokau Coalfield of North Taranaki.Following detailed mapping of exposures (Phelp 1981) a drilling programme was undertaken to enable estimates of indicated coal reserves.It was considered desirable during this phase of the investigation to obtain preliminary geotechnical data that could be used in a mining feasibility study.This would also facilitie preparation of a brief for detailed geotechnical work.There do not appear to be any geotechnical problems that will seriously constrain mining in the Mokau Coalfield.
(52)The current level of coal reserves knowledge is presented indicating the deposits considered recoverable.When compared with the total coal demand it can be shown that there are sufficient reserves in the Waikato region for a 1000MW power station.The report explains an investigation for the total coal required for this station would be 60 Mt to be supplied over a period of 40 years and that new station was to be built in two 500 MW stages.The report is a feasibility report of the coal requirements of the Waikato area and how to supply those consumers.
英语翻译关于矿业方面的(51)Ministry of Energy Mines Division has carried
能源与矿业部这样的部门已经在北塔拉那基的摩考煤田里做了大量的地质调查.下列详细的曝光地图(phelp 1981),一个钻井工程正在实施以使得显示煤储量的估计得以实现.人们认为在调查阶段,用该方式来获得采矿可行性研究的初步岩土资料还是令人满意的.这也有助于准备这一精细的土力工程的简要概述.调查显示似乎没有岩土问题会束缚摩考煤田上的采矿工作.
目前人们对煤储量探测这一技术现实水平显示来看,检测出的矿藏是有开采价值的.与总煤炭资源需求相比,可以表明在怀卡托地区的煤储量对于一个1000mw的发电厂来说是充足的.这份报告解释了该发电厂的总煤炭资源需求将是60公吨,而其可以供给超过40年的电量,而新的发电站则将会建成并将其分为两个500MW的阶段.这份报告是一份关于怀卡托地区煤炭需求及如何满足那些用户需求的一份可行性的报告.
因为不是这个专业的,可能用词不太准确